Contact Us

Success Story

Replacement of Overspeed Protection for KT-13-01

Replacement of Overspeed Protection for KT-13-01

Overspeed protection upgrade integrated with ITCC and ESD systems, proven through FAT and on-site SAT.

Industry

Oil & Gas / Petrochemical

Client / End User

PETRONAS Chemicals Fertilizer (Kedah) Sdn. Bhd.

Country

Malaysia

Solutions

Turbomachinery Control System

Scope of Works

  • Engineering, supply and implementation of overspeed protection system for KT-13-01  
  • Integration of SpeedSys 200 devices with Triconex ITCC and ESD systems  
  • Configuration of overspeed detection logic, trip settings and protection parameters  
  • Implementation of protection system for turbine safety and operational reliability  
  • Integration with Distributed Control System (DCS) for monitoring and control  
  • Support for installation, wiring and system interfacing at plant site  
  • Execution of Factory Acceptance Test (FAT) to validate system functionality prior to deployment  
  • Functional testing including logic verification, signal interfacing and system response checks  
  • Execution of Site Acceptance Test (SAT) to verify system performance at plant site  
  • Validation of system integration including ITCC, ESD and DCS interfaces  
  • Final system validation, documentation and handover  

Results

  • Successful upgrade of overspeed protection system for KT-13-01  
  • Verified system performance through FAT and SAT validation
  • Ensured reliable overspeed protection and trip functionality  
  • Enhanced plant safety through high-integrity protection system  
  • Achieved seamless integration with ITCC, ESD and DCS systems